DARA Architects
All projectsWorkplace / DARA

Alrahila Central Hub

Headquarters, fuel services and customer facilities resolved through a clear separation of movement.

Programme
Workplace
Location
Misrata
Design year
2023
Alrahila Central Hub — architectural study 6
Alrahila Central Hub — project image 1

Architecture / DARA2023

Share this project
Start a conversation

The brief sat at a difficult intersection, an administrative headquarters, a fuel station, and customer-facing services packed into a tight Misrata plot bordered by high-traffic roads. The problem was less about form than about flow: trucks, public, and staff each required separate, secure approaches, and the strategic nature of the operation demanded clear separation of service from administrative zones. The plan answers with a strict spatial logic, the fuel canopy and service yard organised along the vehicular axis; the administrative volume lifted clear of it; brand identity carried through massing and material rather than applied signage. Architecture as operations diagram.

DARA Architects

Project imagery includes architectural visualisations and studies.

The Plateau House

Discover the project
The Plateau House